Current Project

We are currently building a second storey extension onto a garage. This extension will include two bedrooms as well as an attic room with a roof window. 

At this stage the brickwork is up, the roof has been tiled and the roof window has been installed

We have recently started putting up the interior stud walls as all of the floorboards have been put down. New floor joists have also been put in. 

The walls, rafters and ceiling have all been insulated and we have new started to install plasterboards.